Bayfield Sewer
Thursday, May 17, 2007
Well, it has been a long saga after Bayfield realized that their building was out-pacing their ability to effectively treat the sewer water. Bayfield imposed a building moratorium and it looked like that builder would not be able to pick up their hammers again until 2008. Now, with a patch work plan in place to reduce high volume sewer contributors and fast track an expansion effort, the town of