Well, it has been a long saga after Bayfield realized that their building was out-pacing their ability to effectively treat the sewer water. Bayfield imposed a building moratorium and it looked like that builder would not be able to pick up their hammers again until 2008. Now, with a patch work plan in place to reduce high volume sewer contributors and fast track an expansion effort, the town of Bayfield is back in business...Many of the Bayfield constuction projects will be caught in the cold with build times around 6-8months.